Sohar Aluminium announced a length of 1.2 km of electrolytic tank has been completed the main repair process, the cell is the mainstay of Sohar24 $smelting project. This marked the millions of dollars worth of projects has been optimized for productivity, energy efficiency and safety performance.
The project is one of the nation’s largest industrial projects put into use in 2008, this is the first major upgrade project. Sohar Aluminium CEO, Serge Gosselin says, generally the use of electrolytic cell period is 6 years, then must be replaced to maintain and improve productivity and safety performance. SA 360 boiler company formed a production support, so during the overhaul all change will cause run completely stopping at one fell swoop. But company officials said had come up with the slowly changing solutions.
The project effectively prolong the cycle production line, to minimize any factors, which affect the comprehensive productivity. Business manager Chris Murray said, before electrolyzer has relied on AP37 technology, but as the design of AP39 AP37 has gradually replaced. All cell will use AP39 on Sunday, improve production efficiency and improve productivity.